How can we help you?

From pinpointing gas leaks in industrial pipelines to detecting vacuum leaks in composite materials, our cameras offer precise, non-destructive testing solutions.

Ensure safety, plant availability, and process reliability in your industry.

oil and gas industry
OIL AND GAS

Whether conducting daily operations, managing turnarounds, or starting up new facilities at onshore or offshore plants, Distran’s Ultra Pro and Ultra Pro X (Ex-proof) help you protect staff and streamline inspections.

Power generation
POWER GENERATION

Distran ultrasonic cameras empower power plants to enhance availability and performance while prioritizing safety. They detect leaks of all gases including dry steam and vacuum leaks.

pharmaceutical plant
CHEMICAL AND PHARMACEUTICAL

Boosting both process reliability and product quality, Distran’s acoustic cameras find gas and vacuum leaks promptly. They drastically reduce the need for production halts due to labor-intensive testing procedures.

hydrogen facilities
HYDROGEN PROCESSING
INDUSTRIES

The Ultra Pro X not only increases safety and decreases inspection times by detecting gas leaks faster and from safe distances. The Ex-proof camera also enables to inspect large hazardous, noisy, and hard-to-reach areas without scaffolding.

composite manufacturing for planes
COMPOSITE
MANUFACTURING

Composite manufacturing requires perfect vacuum integrity before treatment. With Distran Ultra CE, producers can speed up the bagging process by pinpointing vacuum leaks instantly.

gas leak detection as a service
GAS LEAK DETECTION
AS A SERVICE

For industrial service providers, Distran ultrasonic cameras are an easy-to-use tool to expand the offering with comprehensive leak detection as well as to increase safety and save money at the customers’ facilities.

“The unique features of the Distran acoustic camera,
in particular the quantification of the leak rate, empowered us to estimate the degree of urgency for intervention.

In addition to ensuring continuity of supply to the network, the avoided shutdown
would have cost between 5 to 6 million euros per day of shutdown.”

 

Xavier Bacquenois
Plant Manager – EDF NPP Dampierre-en-Burly